GPSTracker - Accurate Real-Time Location Monitoring Tracker

GPSTracker - Accurate Real-Time Location Monitoring Tracker

Regular price $26.98
Regular price $26.98 Sale price $55.00
SAVE 50% Sold out

📍 Live Updates

🧲 Secure Attachment

📦 Discreet Placement

🔊 Easy Finding

 
 
GPSTracker - Accurate Real-Time Location Monitoring Tracker

GPSTracker - Accurate Real-Time Location Monitoring Tracker

Regular price $26.98
Regular price $26.98 Sale price $55.00
SAVE 50% Sold out
  • American express payment method American Express
  • Apple pay payment method Apple Pay
  • Diners club payment method Diners Club
  • Discover payment method Discover
  • Google pay payment method Google Pay
  • Master payment method Mastercard
  • Paypal payment method PayPal
  • Shopify pay payment method Shop Pay
  • Venmo payment method Venmo
  • Visa payment method Visa

49 People are checking out...

View full details
📦 A Compact Design That Stays Out Of Sight Small and easy to place discreetly, this tracker fits naturally with vehicles, bags, and valuables without drawing unnecessary attention.
🧲 A Secure Magnetic Grip For Easy Attachment The built-in magnetic grip attaches firmly to metal surfaces while making the tracker simple to attach and remove whenever needed.
📍 Real-Time Location Updates Right From Your Phone Connected with the “Find My” app, it provides real-time location updates so you can conveniently monitor the position of tracked items.

Small, Discreet, And Easy To Place

A compact design that fits naturally into everyday tracking.

Small enough for discreet placement, the tracker can be used with vehicles, bags, and valuables without taking up much space or drawing unnecessary attention.

Secure Magnetic Attachment For Metal Surfaces

Simple to attach, remove, and keep securely in place.

The built-in magnetic grip attaches firmly to metal surfaces, helping keep the tracker positioned securely while making attachment and removal quick and convenient.

Real-Time Location Updates With Find My

Stay informed with location information right from your phone.

Using the “Find My” app, the tracker provides real-time location updates, helping you monitor the position of vehicles, belongings, or other important items.

Why Choose Us?

  Others
Real-Time Tracking
Magnetic Grip
Compact Design
100 dB Buzzer
  • Easy To Keep An Eye On Important Items

    I wanted something compact for keeping track of important belongings. The small design makes it easy to place discreetly, while location updates are convenient to check from my phone.

    Daniel R.

  • The Magnetic Attachment Is Convenient

    The magnetic grip is one of my favorite features. It attaches easily to metal surfaces and stays in place, which makes it practical for items that move around regularly.

    Amanda S.

  • Helpful For Keeping Track Of A Vehicle

    I like having a simple way to check a tracked item from my phone. The real-time location feature makes monitoring more convenient without needing to constantly check in person.

    Chris M.

    Frequently Asked Questions

    The tracker works with the “Find My” app, allowing you to view location updates and monitor the tracked item from your phone.

    The magnetic grip is designed to attach securely to metal surfaces, making it suitable for vehicles and other compatible items.

    Yes. Its compact ABS design makes it easy to place discreetly on vehicles, bags, valuables, or other suitable items.

    It uses a CR2032 3V battery with a listed capacity of 220mAh.

    Yes. The built-in buzzer has a maximum volume of 100 dB, providing an audible sound to help locate the device.